make text bigger | make text smaller

Dams

2002 |2003 | 2004 | 2006 | 2007 | 2008


Dam Projects for 2002

PHILEX MINES Tailings Dam No. 1
Padcal, Benguet
PHILEX MINING CORP
Geotechnical Assessment, Field Testing, Monitoring of the Construction Earthfill Tailings Storage Dam.
PHILEX MINES Tailings Dam No. 2
Padcal, Benguet
PHILEX MINING CORP
Geotechnical Assessment, Field Testing, Monitoring of the Construction Earthfill Tailings Storage Dam.
PHILEX MINES Tailings Dam No. 3
Padcal, Benguet
PHILEX MINING CORP
Geotechnical Assessment, Field Testing, Monitoring of the Construction Earthfill Tailings Storage Dam.
 
back to top

Dam Projects for 2003

ITBAYAT INTEGRATED AREA IRRIGATION DAM
Itbayat, Batanes
DEPT. OF PUBLIC WORKS & HIGHWAYS
Injection Cement Grouting and Dentition Remedial Works (April 2003 Sept. 2003)
 
back to top

Dam Projects for 2004

ITBAYAT INTEGRATED AREA IRRIGATION DAM
Itbayat, Batanes
DEPT. OF PUBLIC WORKS & HIGHWAYS
Subsurface Geological, Geotechnical & Foundation Investigation. Earthfill Irrigation Dam. (March 2004 - Feb. 2006)
 
back to top

Dam Projects for 2006

PANIGAN POWER HYDROELECTRIC DAM
Davao City
HEDCOR, INC.
Subsurface Geological, Geotechnical, Foundation Investigation, Field & Geomechanics Laboratory Testing, and Slope Stability Analysis. Mini-Hydroelectric Dam. (Mar. 2006- July 2006)
ITBAYAT INTEGRATED AREA IRRIGATION DAM
Itbayat, Batanes
DEPT. OF PUBLIC WORKS & HIGHWAYS
Re-design and Construction Earthfill Irrigation Dam. (Feb. 2006-Present)
 
back to top

Dam Projects for 2007

PHILGOLD MINE INC. TAILINGS STORAGE DAM
Aroroy, Masbate
PHILIPPINE GOLD, INC.
Subsurface Geological, Geotechnical, Foundation Investigation, Field & Geomechanics Laboratory Testing Mine Tailings Main Storage Dam. (July. 2007 Feb. 2009)
TAMUGAN POWERPOWER HYDROELECTRIC DAM
Davao City
HEDCOR, INC.
Subsurface Geological, Geotechnical, Foundation Investigation, Field & Geomechanics Laboratory Testing, and Slope Stability Analysis. Mini-Hydroelectric Dam. (June. 2007 Sept. 2007)
SUAWAN HYDROELECTRIC DAM
Davao City
HEDCOR, INC.
Subsurface Geological, Geotechnical, Foundation Investigation, Field & Geomechanics Laboratory Testing, and Slope Stability Analysis. Mini-Hydroelectric Dam. (Nov. 2007 - August 2008)
DIDIPIO MINE TAILINGS Dam
Nueva Vizcaya, Quirino
AUSTRALASIAN PHILS. MINING, INC.
Peer Review of the Feasibility Study of Australian Mining, Inc. Earthfill Tailings Storage Dam. (Feb May 2007)
 
back to top

Dam Projects for 2008

PHILGOLD MINE INC. TAILINGS STORAGE DAM
Aroroy, Masbate
PHILIPPINE GOLD, INC.
Geomechanics Field & Laboratory Testing, and Construction Monitoring Mine Tailings Storage Saddle dam. March 2008 Present (Feb. 2009)
 
back to top

Welcome to the New Geotecnica Corporation Website. Kindly send your comments and suggestion to improve the website to our webmaster.

A BROWN HOUSING DEVELOPMENT Tanay, Rizal / July 2009
Geotechnical foundation investigation, field & geomechanics laboratory testing.
A BROWN COMPANY, INC.

GOLD PROCESSING PLANT
Aroroy, Masbate / Jan 2008 – July 2009
Geomechanics laboratory testing of the Tailings Storage Facility.

PHILIPPINE GOLD, INC.
PHILEX MINES

Padcal, Benguet / July 2009
Geotechnical assessment of the stability of Philex Mines tailings dams
PHILEX MINING CORP

 

Saldivar-Sali, A.N.D., 2004,”A Landslide Risk Rating System for the Baguio City, Philippines Area”, Massachusetts Institute of Technology M.Eng. Thesis. 160 p.

Saldivar-Sali, A., et al, 1986, Tectonic Setting and Petroleum Possibilities of Philippine Sedimentary Basins: Transactions, 4th Circum-Pacific Energy and Mineral Resources Conference,Singapore, AAPG Publication.

 

List of Publications